Phase 1
480 kW
- Commissioned
- March 2020
- Modules
- Canadian Solar 450Wp
- Inverters
- ABB
- Mounting
- Mini rail mounting
- Metering
- Net metering
- Roof
- Rooftop tin shed
Medical devices manufacturing. Three phased rooftop builds. One EPC partner.
SEZ, JAIPUR
Poly Medicure needed rooftop solar at its Jaipur SEZ plant without putting precision medical equipment at risk or losing usable space below the roof.
SolarMaxx designed a mounting approach that protected the roof and kept the floor below usable, then repeated it as capacity grew.
A phased build gave Poly Medicure more capacity over time without stopping manufacturing.
480 kW
310 kW
510 kW





SEZ & BAGRU, JAIPUR

SITAPURA, JAIPUR

GHANA, AFRICA
Get a free site assessment and financial model. No obligation. No generic quotes.
Book a Free Assessment