Precision-Driven SolarCommissioning for Peak Performance.

With 18+ years, 600+ rooftop sites, and 250+ MW installed, SolarMaxx commissions C&I plants so every component is tested and verified before handover.

How We Install

Installation and Grid Sync

Our expert team ensures all paperwork is seamless with verification of documents. We meticulously test and verify every component, ensuring seamless integration and optimal functionality. From initial inspections to final validation, your solar installation meets regulatory standards and is built for long-term reliability.

Civil, mechanical, and electrical work is executed by our in-house team. Installation is planned around your shift schedule, with structural work isolated from production areas. Grid synchronisation, DISCOM metering filing (net or gross, as applicable), and handover with full documentation are handled end-to-end.

8 to 12 wks

Typical rooftop timeline from feasibility sign-off to grid commissioning (100 kW to 500 kW)

In-house

Civil, mechanical, and electrical execution by SolarMaxx teams

DISCOM

Metering arrangements, inspection, and approval follow-up included in scope

What We Deliver

Commissioning Verification

Documentation & Verification

Testing & Validation

Regulatory Compliance

DISCOM Handover Support

Commissioning and Performance Testing

01

Documentation and Verification

Paperwork, drawings, and handover packs are verified before and after installation so your plant is ready for DISCOM inspection and long-term operation.

02

Testing and Validation

Every component is tested and verified before handover. Performance testing and grid synchronisation confirm the plant is ready to generate.

03

Regulatory Compliance

Installations are executed to meet regulatory standards. SolarMaxx manages net or gross metering applications (as applicable), inspection scheduling, and approval follow-up with the relevant DISCOM.

04

Installation and Handover

From mounting structure fabrication and roof sealing to AC/DC wiring, earthing, and lightning protection, one team owns the site through commissioning.

Process

Installation Without Production Disruption.

Planned Around Your Shifts

Installation planned around your shift schedule. Structural work isolated from production areas.

Civil, Mechanical, Electrical

Hot-dip galvanised mounting, cable trays, and full balance-of-system electrical work executed on site.

Commissioning & Handover

Grid synchronisation, documentation package, and monitoring setup before we hand the plant to your team.

Common Questions

Installation Questions

Installation is planned around your shift schedule. Structural work is isolated from production areas. Most plants are commissioned without a single day of downtime.

Facility Installation Planning

We will visit your site, assess structural readiness, and map an installation plan around your operations.