Pune, Maharashtra

Commercial and Industrial Solar in Pune

Commercial solar installation supporting C&I projects like those delivered in Pune
Local Context

Why Solar in Pune

5.3 hrs
Peak Sun Hours Daily
DISCOM
Local DISCOM
Rs 9.0/unit
Avg Commercial Tariff

Pune's auto, engineering, IT, and manufacturing corridor has large rooftops and high commercial tariffs. Factories and commercial campuses across Pune and surrounding industrial belts are strong candidates for 100 kWp to multi-megawatt rooftop plants with DISCOM metering.

SolarMaxx

Local Project Delivery

SolarMaxx delivers C&I solar for Pune facilities with the same accountable model used across North and West India: one partner from survey and DISCOM approvals to commissioning and O&M.

Process

Project Delivery

1. Site Survey

Roof structural assessment, shadow analysis, and load data review.

2. Design and DPR

System sizing, single-line diagram, and savings model for your board.

3. Install and Commission

Turnkey EPC with DISCOM metering arrangements and grid synchronisation.

4. Monitor and Maintain

Live generation tracking and preventive O&M from our North India operations team.

Local Insight

Local Solar Market

SolarMaxx supports commercial and industrial buyers in Pune with the same accountable EPC model used across North India: feasibility, DISCOM paperwork, installation, and O&M under one partner.

Featured Project Nearby
Rooftop solar at Ranchi, Jharkhand, 900 kW

Ranchi, Jharkhand - 900 kW

SolarMaxx delivered a 900 kW rooftop solar plant for a bakery manufacturer in Ranchi with DG synchronisation and net metering. Similar commercial and industrial plants across North India follow the same turnkey delivery model.

900 kW Capacity

Read Case Study
Common Questions

Regional Solar Requirements

SolarMaxx handles all DISCOM documentation, net or gross metering applications (as applicable), inspection scheduling, and approval follow-up. This is included in our EPC contract at no extra cost.

For a standard rooftop installation between 100 kWp and 500 kWp, the full process from site survey to grid commissioning typically takes 8 to 12 weeks. Larger utility-scale projects take 16 to 24 weeks depending on DISCOM approval timelines.

View all FAQs →

18+ Years

Of C&I solar EPC experience

600+ Rooftop Sites

Delivered across India

Talk to a Solar Engineer

Call 0141 4009995. Response within 1 business day.

Free Assessment

Request a Site Assessment